The same bridge can be installed in very different ways. The erection method is chosen from site access and available lifting equipment, not from preference, and it has a direct effect on cost and programme.
Crane-lifted full sections
Where a crane can reach the crossing, panels are assembled on the bank into full sections and lifted into place. This is the fastest method and suits sites with hard standing and crane access.
Cantilever launching
When cranes cannot reach — over rivers, valleys or confined sites — the bridge is built on a launching nose and pushed out span by span, counterweighted at the rear. It is slower but needs far less heavy plant.
Ground and access decide
Bank bearing capacity, slope, water and the route for delivery trucks all feed into the choice. A difficult site may need temporary works before erection can start.
Safety and load testing
Both methods use controlled sequencing and temporary bracing. After installation the bridge is load-tested and handed over with the as-built configuration recorded.
Plan the method early
The erection method affects the layout and the parts list, so it should be agreed at design stage. Send your site constraints and we will recommend a method in the proposal.