Bailey Bridge Configuration Calculator

Choose a span and a load class — instantly see the recommended 321 Bailey bridge arrangement and a complete component list with quantities and theoretical weights.

Configure your bridge

Select the span and the load class. The tool matches the lightest compliant 321 Bailey bridge configuration and lists every component — quantities and weights only, no prices.

Crawler classes 150/250/400/500 kN (≈15/25/40/50 t); wheel classes Truck 10/15/20 and Trailer 80. Speed limit: 5 km/h for crawler, ≤30 km/h for truck classes.

How the matching works

Based on the 321 assembled steel bridge load-span combination tables and the manufacturer's calculation model.

1. Span and load determine the row/layer arrangement

The manual's load-span combination tables (tracked load and wheel load) specify the maximum span for each arrangement — single-row single-layer, double-row single-layer, triple-row single-layer, double-row double-layer and triple-row double-layer — with and without reinforcing chords. The calculator searches all ten configurations and selects the lightest one that covers your span, which is normally the most economical.

2. Component quantities follow the calculation model

Every 3 m bay uses two Bailey panels per row. Quantities of panels, pins, cross beams, clamps, bracing, deck panels, bolts and bearings are computed with the same formulas used in our project quotation model. Unit weights are theoretical values for planning.

3. Verify before you build

This tool is for preliminary selection only. Foundation conditions, speed, load combination, deflection and local regulations must be checked by a qualified structural engineer. Send us your result and we will prepare a reviewed proposal and quotation.

Read the bridge selection guides · Bailey bridge systems · Completed projects

Frequently asked questions

How do I choose between single-row and double-row?

Enter your span and load. Short spans with light loads are usually served by a single-row single-layer bridge; longer spans or heavy plant require double or triple rows and, at the upper end, two layers.

When is a reinforced bridge needed?

Reinforcing chords are fitted to the top and bottom chords to raise bending capacity. The calculator adds reinforced configurations to the comparison whenever they are permitted by the manual.

Does the calculator include prices?

No — quantities and theoretical weights only. Ask us for a quotation covering rental, transport and erection.