An 84 m long, 24 m wide traffic-diversion steel bridge built in Longhua, Shenzhen, using 321-type Bailey trusses to cross the live Meiguan Expressway in a single 24 m span. Because traffic on the expressway could not be interrupted, the working area was tightly constrained and lifting and erection had to be completed within short possession windows, making the operation both difficult and safety-critical. With a demanding completion deadline, there was no room for delay. Drawing on a proven modular steel bridge system and extensive experience of bridge erection over live roads, the Jiuzhoutong team optimised the construction sequence and worked around the clock, delivering on the client's required milestone with both quality and schedule assured. The bridge provided a reliable temporary route for the expressway diversion works, and all standardised components can be dismantled and reused.
An 84 m long, 24 m wide traffic-diversion steel bridge built in Longhua, Shenzhen, using 321-type Bailey trusses to cross the live Meiguan Expressway in a single 24 m span. Because traffic on the expressway could not be interrupted, the working area was tightly constrained and lifting and erection had to be completed within short possession windows, making the operation both difficult and safety-critical. With a demanding completion deadline, there was no room for delay. Drawing on a proven modular steel bridge system and extensive experience of bridge erection over live roads, the Jiuzhoutong team optimised the construction sequence and worked around the clock, delivering on the client's required milestone with both quality and schedule assured. The bridge provided a reliable temporary route for the expressway diversion works, and all standardised components can be dismantled and reused.
An 84 m long, 24 m wide traffic-diversion steel bridge built in Longhua, Shenzhen, using 321-type Bailey trusses to cross the live Meiguan Expressway in a single 24 m span. Because traffic on the expressway could not be interrupted, the working area was tightly constrained and lifting and erection had to be completed within short possession windows, making the operation both difficult and safety-critical. With a demanding completion deadline, there was no room for delay. Drawing on a proven modular steel bridge system and extensive experience of bridge erection over live roads, the Jiuzhoutong team optimised the construction sequence and worked around the clock, delivering on the client's required milestone with both quality and schedule assured. The bridge provided a reliable temporary route for the expressway diversion works, and all standardised components can be dismantled and reused.
| Item | Specification |
|---|---|
| Location | Longhua, Shenzhen, Guangdong, China |
| Bridge type | 321 Bailey panel modular steel bridge over a live expressway |
| Deck / layout | 24 m |
| Span | 84 m total length, 24 m single span |
| Load use | Designed for expressway diversion traffic |
| Completed | 2022 |







24 m
84 m total length, 24 m single span
Send us the span, deck width and load — we will propose a configuration based on projects like this one.