A two-lane 321-type Bailey bridge with a stand-alone side walkway, installed in 2021 to keep construction traffic and site pedestrians apart on a busy hospital expansion project.

← All projects

A two-lane 321-type Bailey bridge with a stand-alone side walkway, installed in 2021 to keep construction traffic and site pedestrians apart on a busy hospital expansion project.

The Shunde Heping Surgery Hospital expansion needed a reliable temporary crossing for trucks, material haulage and a steady flow of workers and visitors. We supplied a 321-type Bailey bridge in a triple-row reinforced configuration: the main deck carries two traffic lanes, while a separate side walkway — complete with handrails and green safety mesh — gives pedestrians their own route.

This people–vehicle separation is the defining feature of the project. Vehicles stay on the reinforced main trusses; foot traffic uses the independent walkway alongside, so the two flows never cross. The arrangement improves site safety without reducing haulage capacity.

The bridge was erected in 2021 for the main contractor, China 20th Metallurgical Construction Group, and served the project through the construction period. All Bailey panels and accessories are modular and reusable after dismantling.

ItemSpecification
LocationShunde, Foshan, Guangdong, China
Bridge type321-type Bailey bridge, triple-row reinforced
Deck layoutTwo traffic lanes + dedicated side pedestrian walkway
SpanBuilt to site conditions
Load useConstruction vehicles and pedestrians
Completed2021
Main contractorChina 20th Metallurgical Construction Group
321 Bailey Bridge with Dedicated Pedestrian Walkway, Shunde321 Bailey Bridge with Dedicated Pedestrian Walkway, Shunde321 Bailey Bridge with Dedicated Pedestrian Walkway, Shunde321 Bailey Bridge with Dedicated Pedestrian Walkway, Shunde

Why this project stands out

01

Triple-row reinforced

321-type panels stacked in three rows for the dual-lane deck.

02

People–vehicle separation

A dedicated walkway with handrails and mesh keeps pedestrians off the truck lanes.

03

Reusable steel

Panels, bracing and deck plates return to stock after the works finish.