A two-lane 321-type Bailey bridge with a stand-alone side walkway, installed in 2021 to keep construction traffic and site pedestrians apart on a busy hospital expansion project.
A two-lane 321-type Bailey bridge with a stand-alone side walkway, installed in 2021 to keep construction traffic and site pedestrians apart on a busy hospital expansion project.
The Shunde Heping Surgery Hospital expansion needed a reliable temporary crossing for trucks, material haulage and a steady flow of workers and visitors. We supplied a 321-type Bailey bridge in a triple-row reinforced configuration: the main deck carries two traffic lanes, while a separate side walkway — complete with handrails and green safety mesh — gives pedestrians their own route.
This people–vehicle separation is the defining feature of the project. Vehicles stay on the reinforced main trusses; foot traffic uses the independent walkway alongside, so the two flows never cross. The arrangement improves site safety without reducing haulage capacity.
The bridge was erected in 2021 for the main contractor, China 20th Metallurgical Construction Group, and served the project through the construction period. All Bailey panels and accessories are modular and reusable after dismantling.
| Item | Specification |
|---|---|
| Location | Shunde, Foshan, Guangdong, China |
| Bridge type | 321-type Bailey bridge, triple-row reinforced |
| Deck layout | Two traffic lanes + dedicated side pedestrian walkway |
| Span | Built to site conditions |
| Load use | Construction vehicles and pedestrians |
| Completed | 2021 |
| Main contractor | China 20th Metallurgical Construction Group |



321-type panels stacked in three rows for the dual-lane deck.
A dedicated walkway with handrails and mesh keeps pedestrians off the truck lanes.
Panels, bracing and deck plates return to stock after the works finish.
Send us the span, deck width and load — we will propose a configuration based on projects like this one.