A 21 m × 6 m temporary steel access trestle that gave heavy trucks a stable haul road beside an urban overpass worksite.
When an overpass is built in a live urban area, the construction haul road often has to cross an existing obstacle without interrupting traffic below. This 21 m steel trestle was erected as a temporary work platform and haul crossing for the site.
The deck is 6 m wide, formed from eight truss lanes in a single tier. Full sections were lifted into place by crane, which kept the on-site assembly window short and reduced disruption to surrounding traffic.
The bridge carried heavy construction vehicles throughout the works. Because it uses standard modular panels, the whole structure can be dismantled and the steel returned to stock for the next project.
| Item | Specification |
|---|---|
| Span | 21 m |
| Deck width | 6 m |
| Configuration | 8 truss lanes, single tier |
| Erection | Crane-lifted full sections |
| Traffic | Heavy construction vehicles |
| Use | Construction access and haul road |
| Reusability | Fully reusable modular steel |
Clear span and deck width sized for a two-way construction haul road.
Eight truss lanes give the deck the stiffness needed for heavy trucks.
Pre-assembled sections reduced road closure time during erection.
Send us the span, deck width and load — we will propose a configuration based on projects like this one.